Myrtle Avenue Line Viaduct and Bridge Replacement — LiDAR Coordination

UrbanTech construction engineering support including phasing, temporary support, geometric control, shop drawings, and LiDAR / laser scanning.

LocationBrooklyn, New York
MarketsTransit · Rail · Reality Capture
Owner / AgencyMTA
Relevant capabilitiesLiDAR and laser scanning · Geometric analysis · Construction phasing · Temporary structural support
Existing Myrtle Avenue Line viaduct seen from street level.
Image 1 of 3Field view of the viaduct and bridge replacement setting.

Experience

What the work demonstrates

UrbanTech provided construction engineering for replacement work on the Myrtle Avenue Line, including phasing, demolition planning, temporary support, geometric analysis, steel shop drawing support, and LiDAR scanning. The scanning work supported coordination of replacement structures within a constrained active-transit environment.

Highlights

01

UrbanTech used LiDAR / laser scanning for coordination of replacement structures.

02

Geometric analysis supported new railroad and utility-support structures.

03

Construction engineering included phasing, demolition planning, and temporary support.

04

A temporary steel tower and catenary system supported live signal cables during construction.

05

Steel shop drawing support was coordinated with existing and proposed geometry.