Goethals Bridge Replacement — As-Built BIM Documentation
UrbanTech LOD 500 as-built BIM modeling for bridge utility conduit systems as part of broader construction engineering support.

Experience
What the work demonstrates
As part of UrbanTech's broader construction-engineering role on the Goethals Bridge Replacement, the team produced LOD 500 as-built BIM models for bridge utility conduit systems. The work demonstrates detailed digital documentation of installed infrastructure and the value of maintaining a structured, high-fidelity asset record beyond construction.
Highlights
UrbanTech produced LOD 500 as-built BIM models for bridge utility conduit systems.
The digital documentation formed part of UrbanTech's broader construction-engineering support on the Goethals Bridge Replacement.
Related UrbanTech work on the project also included temporary works, pylon construction support, and erection/stability engineering.